My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-03_REVISION - M2004013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004013
>
2019-05-03_REVISION - M2004013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:20:26 AM
Creation date
5/6/2019 3:33:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004013
IBM Index Class Name
REVISION
Doc Date
5/3/2019
Doc Name
Adequacy Review Response
From
Pete Lien & Sons
To
DRMS
Type & Sequence
TR2
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> i <br /> MAILING ADDRESS: PO. BOX 440 RAPID CITY, SD 57709-0440 PH, 605-342-7224 <br /> PHYSICAL ADDRESS* 3401 UNIVERSAL DR. RAPID CITY, SD 57702 FX 605-342-6979 <br /> t� <br /> t RECEIVED <br /> ' •_ & Sons, Inc. <br /> ;�• MAY 0 3 2019 <br /> p DIVISION OF RECLAMATION <br /> A ril23, 2019 MINING AND SAFETY <br /> CO DRMS <br /> Attn: Mr. Patrick Lennberg <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 <br /> t <br /> Re: Pete Lien &Sons, Inc.;St. Barbara Sand and Gravel Mine; Permit No. M-2004-013• <br /> Technical Revision (TR-02)Adequacy Review Response <br /> Dear Mr. Lennberg, <br /> Pete Lien & Sons, Inc. (PLS) is providing the following response to the comments provided in the <br /> R St. Barbara Sand and Gravel Mine technical revision(TR-02) adequacy review. For ease of review, <br /> PLS is providing the formal comment followed by the PLS response in bold. <br /> 1. Please specify the size of the area that is proposed to be isolated by the slurry wall construction? <br /> In addition, provide a revised Mining Plan Map with a label specifying the acreage. <br /> t <br /> PLS Response: The overall area for the slurry wall cell is planned to be approximately 69 acres. <br /> Final design is currently in process. Please see the revised Mining Plan Map. <br /> 2. Please provide an approximate timetable to describe the mining operation as required by Rule <br /> 6.4.4(e). The timetable is for the purpose of establishing the relationship between the mining and <br /> reclamation during different phases of the mining operation. Such timetable should include: <br /> a. An estimate of the time periods of time which will be required for the various stages or phases <br /> of the operation; <br /> PLS Response: The area within the slurry wall cell is planned to be mined within 10 years <br /> following construction, with mining sub-blocks shown on the enclosed revised Mining Plan <br /> E Map. Please note there are 14 mining blocks shown,however the first four western blocks have <br /> currently been mined or previously disturbed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.