My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-09_PERMIT FILE - M2019018 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019018
>
2019-04-09_PERMIT FILE - M2019018 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 4:38:54 AM
Creation date
4/9/2019 2:31:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019018
IBM Index Class Name
PERMIT FILE
Doc Date
4/9/2019
Doc Name
Application
From
J Graff Enterprises
To
DRMS
Email Name
SJM
WHE
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> EXHIBIT E RECLAMATION PLAN <br /> 1. General Reclamation Plan <br /> The total permit area is 256.2 acres. The post-mining land use for the BRS&G Pit 1 will be lakes <br /> with surrounding dryland fields. The rough breakdown of these areas can be seen below: <br /> Table E-1 Reclaimed Areas <br /> Post Mine Land Use Area(acres) <br /> Fields 12.1 <br /> Lakes 145.2 <br /> Roads 3.0 <br /> Undisturbed 95.9 <br /> Total Permit 256.2 <br /> As described in the mining plan, reclamation will occur concurrently with mining. Topsoil and <br /> overburden from the current mining area will be used to reclaim the mined out areas. Topsoil will <br /> be replaced on all graded areas except those areas that are at least 10 feet below expected water <br /> level. By doing this the distance that the topsoil and overburden will have to be transported as well <br /> as the amount of material which will have to be rehandled will be minimized. Additionally, the <br /> acreage which is unreclaimed will be minimized, which will make the worst case reclamation <br /> smaller and thus, the bond will be smaller. The existing irrigated crop fields will be maintained <br /> until it is time to mine them. <br /> All reclamation slopes will be 3H:1 V or shallower. No more than 2000' of highwall will remain <br /> unbackfilled at any time. <br /> The access to the site will remain following mining and reclamation as it is the only property <br /> access. Internal roads that are used by the farming operation will remain as well, if undisturbed by <br /> mining. <br /> BRS&G Pit 1 l.rc I.asaal and �ssnei.ur..I'I i< <br /> March 2019 E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.