2. Reclamation Timetable <br /> The time for reclamation is shown below. Exhibit L: Reclamation Costs describes the worst case <br /> bond scenario. <br /> Table E-2 Reclamation Timetable <br /> Task Description Reclamation <br /> Time <br /> 1 Install access improvements 0.1 Years <br /> 2 Mine Area 1 3.9 Years <br /> 3 Mine Areas 2-10 while reclaiming each previous 46.6 Years <br /> area as mining progresses. <br /> 4 Reclaim Area 10 and remove all facilities and plants. 0.3 Years <br /> Revegetate facilities area. 0.2 Years <br /> Total 51.1 Years <br /> 3. Revegetation Plan <br /> For all revegetation areas,the soil will be disced to loosen the soil. Due to the mild grade, seed can <br /> be drilled. All will be seeded with the mix listed below. Certified weed free mulch will be crimped <br /> into the surface at 2000 lbs per acre. Heavy furrows will be left in the tilled topsoil to provide <br /> moisture concentration and shade areas in order to promote better conditions for successful <br /> vegetation establishment. Seeding will take place the fall after which a slope has been retopsoiled. <br /> Slopes will be regraded, backfilled, and retopsoiled as soon as they are able to be reclaimed. <br /> Revegetation will take place to a point 10 feet below the anticipated water level of the lakes. <br /> BRS&G Pit 1 <. x i.,.,► a�a �5,„.,n,,ri i< <br /> March 2019 E-2 <br />