Laserfiche WebLink
5. Water Information, Rights and Augmentation <br /> All water rights issues such as availability of water for this operation, consumption rates, dust <br /> control, etc. is presented in Exhibit G - Water Information. <br /> 6. Schedule of Operations <br /> Mining operations will only occur as dictated by demand up to the maximum rates described <br /> earlier in the mine plan. Mining, screening and processing will be conducted with portable <br /> equipment at various times of the year. Product will be sold from this activity throughout the <br /> year, although little is expected to be sold in winter months. The operator will not have night <br /> gravel mining operations, although minor truck activity or repairs may occur after hours. Hours <br /> of operation will reflect those approved in any local permits. <br /> 7. Delta County Impacts and Environmental Impacts <br /> The impacts to Delta County will be limited.Noise and traffic will be mitigated by best <br /> management practices and requirements in the local use permit. <br /> BRS&G hit I l:n;;I ea isA�anJ NI I< <br /> March 2019 D-7 <br />