Laserfiche WebLink
Journey Ventures Pit, Technical Revision No.4 Request,File No. M-2008-080 317119 <br /> -2- <br /> 1. Journey Ventures, LLC has completed the design, construction, and the leak test for <br /> the slurry wall liner for the Journey Ventures Pit perimeter around Phase 1. Attached <br /> are the following documents for the completed slurry wall liner: <br /> a. As-Constructed Plans; <br /> b. The approval from the State Engineer's Office. <br /> The inclusion of this information enables Journey Ventures, LLC to be eligible for the <br /> reduced construction financial warranty for the slurry wall liner (20% bonding option). <br /> 2. A revised Exhibit L — Reclamation Costs and supporting calculations are attached <br /> which summarize the revision to the financial warranty requirements, including a <br /> reduction to 20% of the installation costs for the slurry wall liner component of the <br /> bond. <br /> Journey Ventures, LLC appreciates your consideration of this revision request and looks <br /> forward to your response. <br /> Please feel free to contact me with any questions or comments. <br /> Sincerely, <br /> J. . York, P. <br /> J&T Consulting,Inc. <br /> Attachments: <br /> Revised Exhibit C—Pre-Mining/Mining Plan <br /> Revised Exhibit F—Reclamation Plan <br /> Revised Exhibit L—Reclamation Costs and Reclamation Costs Summary Table <br /> "Journey Ventures Pit Slurry Wall Liner As-Constructed Plans"by J&T Consulting <br /> Approval of Slurry Wall Leak Test from State Engineer's Office <br /> $216 Check for Technical Revision review fee <br /> Cc: Journey Ventures, LLC <br /> File <br /> 641 305 Denver Avenue—Suite D•Fort Lupton CO 80621 • Ph: 303-857-6222•Fax: 303-857-6224 <br />