My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-27_REVISION - M2008080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008080
>
2019-03-27_REVISION - M2008080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:53:38 AM
Creation date
3/27/2019 3:01:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
Revision
Doc Date
3/27/2019
Doc Name
Request for Technical Revision
From
Journey Ventures, LLC
To
DRMS
Type & Sequence
TR4
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. Journey Ventures,LLC <br /> Journey Ventures Pit <br /> 3/12/2019 <br /> Reclamation Bond Quantities and Costs <br /> ©2019 J&T Consulting.Inc. <br /> Summary of Unit Costs <br /> Direct costs <br /> Re-applying topsoil 12"thick $1,800 /acre <br /> Revegetating disturbed area $1,000 /acre <br /> Dewatering full pit $400 / million gallons <br /> Slurry Wall Cost(65 foot average depth) $210 / linear foot <br /> (0-50 R @$3/(t-51-70 ft @$4//t-71-75 R @$I-) <br /> Scarifying Ground $200 /acre <br /> Mobilization $2,500 lump sum <br /> Overhead and Profit Costs <br /> Liability insurance 1.55% of direct cost <br /> Performance bond 1.05% of direct cost <br /> Profit 10.00% of direct cost <br /> Total Overhead Cost 12.60% of direct cost <br /> Project Management <br /> Engineering and bidding 4.25% of direct cost <br /> Management and administration 5.00% of direct cost <br /> Total Additional Cost 9.25% of direct cost <br /> Phase t (30.71 acres) <br /> Reclamation Operation Quantity Unit Multiplier Unit Cost Cost <br /> Scarifying Disturbed Area Phase 1 27.17 ac 1 $200 $5,434 <br /> Topsoil Placement Disturbed Area Phase 1 27.17 ac 1 $1,800 $48,906 <br /> Revegetate Disturbed Area Phase 1 27.17 ac 1 $1,000 $27,170 <br /> Mobilization 1.0 Is 1 $2,500 $2,500 <br /> Total Direct Cost $84,010 <br /> Overhead and Profit Cost(12.60%) $10,585 <br /> Contract Cost $94,595 <br /> Project Management(9.25%) $8,750 <br /> Total Required Financial Warranty For Phase 1 $103,345 <br /> Phase 2 (41.43 acres) <br /> Reclamation Operation Quantity Unit Multiplier Unit Cost Cost <br /> Slurry Wall Phase 2 at 20% 5,730 If 0.2 $210 $240,660 <br /> Scarifying Disturbed Area Phase 2 6.58 ac 1 $200 $1,316 <br /> Topsoil Placement Disturbed Area Phase 2 6.58 ac 1 $1,800 $11,844 <br /> Revegetate Disturbed Area Phase 2 6.58 ac 1 $1,000 $6,580 <br /> Total Direct Cost $260,400 <br /> Overhead and Profit Cost(12.60%) $32,810 <br /> Contract Cost $293,210 <br /> Project Management(9.25%) $27,122 <br /> Additional Financial Warranty Required For Phase 2 $320,332 <br /> Cummulative Financial Warranty Required For Phases 1-2 $423,678 <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.