Laserfiche WebLink
Table L-1 Phase 2 Reclamation Task and Cost Estimate <br /> Activity Description Time (Months) Cost($) <br /> Remove truck scale and office trailer 0.5 5000 <br /> Active highwall backfilling 6 34722 <br /> Topsoilings of all disturbed areas 3 72600 <br /> Revegetation of disturbed areas. Includes seeding and mulching. 4 25500 <br /> Subtotal 14 $137,822 <br /> DRMS Costs (28%x direct costs) $38,590 <br /> Total Bond Amount $176,412 <br /> The total bond for the Douglas Mountain Ranch Mine will $576,128. <br /> DMR (:rvz)A-scki aed As+w•i.tM PLIA <br /> February 2019 L-2 <br />