Laserfiche WebLink
105 <br />106 <br />107 <br />108 <br />109 <br />110 <br />114 <br />115 <br />120 <br />121 <br />122 <br />Broadcast Seeding - Small/Linear Areas <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />41.04 <br />$37,176 <br />$25,060 <br />$90,906 <br />$16,156 <br />$229 <br />$6,501 <br />$25,189 <br />$109,282 <br />$41,622 <br />$6,248 <br />$4,776 <br />Drill Seeding - Interim and Drill Sites <br />REVEGE <br />129.12 <br />Broadcast Seeding - Interim and Drill Sites <br />REVEGE <br />101.40 <br />Weed Control for Reseeded Areas (Assume 20% <br />of Area X 3) <br />REVEGE <br />425.00 <br />Reseed the B Seam Dewatering System #2 Pond 5 <br />Area <br />REVEGE <br />0.50 <br />Reseed Drill Pads and Access Roads <br />REVEGE <br />10.00 <br />Clean Sediment Ponds RP -1, 2/3, 4 and 5a one <br />time <br />TRUCK1 <br />61.16 <br />Site Maintenance During Reclamation and Ten- <br />Year Liability <br />SITEMAINT <br />ENANCE <br />400.00 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />10.00 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />10.00 <br />Mobilize/Demobilize Equipment for Pond <br />Cleaninin /Maintenanc <br />MOBILIZE <br />10.00 <br />SUBTOTALS: <br />4897.4 <br />$4,584,336 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />Performance bond: <br />1.05 <br />Total = <br />Job superintendent: <br />2,448.70 <br />Total = <br />Profit: <br />10.00 <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contractibid preparation: <br />Reclamation management and/or administration: <br />$0 <br />$92,604 <br />$48,136 <br />$178,878 <br />$458,434 <br />$778,050 <br />$5,362,386 <br />Total = $0 <br />4.61 Total = $247,206 <br />3.58 $191,973 <br />CONTINGENCY: 0.00 <br />Total = $0 <br />TOTAL INDIRECT COST = $1,217,230 <br />TOTAL BOND AMOUNT (direct + indirect) = $5,801,566 <br />