Laserfiche WebLink
058 <br />059 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />102 <br />104 <br />Backfill and Regrade B Seam Dewatering System <br />Pond 5 <br />DOZER <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />2 <br />4 <br />1 <br />1 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />3 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.66 <br />Replace Topsoil at B Seam Dewatering System #2 <br />Pond 5 <br />DOZER <br />0.12 <br />Regrade Pond RP -1 Area <br />DOZER <br />0.76 <br />Regrade Pond RP -2/3 Area <br />DOZER <br />1.96 <br />Regrade Pond RP -4 Area <br />DOZER <br />2.08 <br />Regrade Pond RP -5a Area <br />DOZER <br />1.41 <br />Regrade TS#2 Sediment Pond <br />DOZER <br />0.05 <br />Remove Scullion Gulch Check Dams <br />TRUCKI <br />3.75 <br />Regrade B -Seam Dewatering System #1 Pond <br />Area <br />DOZER <br />8.23 <br />Regrade B -Seam Dewatering System #2 <br />DOZER <br />4.27 <br />Backfill SDH -3 Dewatering Treatment System <br />DOZER <br />1.97 <br />Replace Topsoil to SDH -3 Dewatering Treatment <br />System <br />DOZER <br />1.50 <br />Replace Topsoil from Stockpile to D -Portal Area <br />SCRAPERI <br />29.30 <br />Replace Topsoil from Stockpile to East and West <br />Haulroads <br />SCRAPERI <br />22.15 <br />Replace Topsoil from Stockpile to RP -2/3/4 <br />SCRAPERI <br />60.51 <br />Replace Topsoil from Stockpile to RP -1 <br />SCRAPERI <br />13.78 <br />Replace Topsoil from Stockpile to RP -5a <br />SCRAPERI <br />69.12 <br />Replace Topsoil from Stockpile to Slot Storage <br />Area <br />SCRAPERI <br />1.57 <br />Replace Topsoil from Stockpile to Alluvial Well <br />Area <br />SCRAPERI <br />0.45 <br />Replace Topsoil from Stockpile to Overland <br />Conveyor Corridor <br />SCRAPERI <br />7.45 <br />Load/Place Topsoil from D -Portal to East Portal <br />Vent Shaft <br />TRUCKI <br />3.98 <br />Replace Topsoil on Drill Pads and Access Roads <br />MR171 <br />DOZER <br />10.16 <br />Replace Topsoil from Stockpile to Access Roads <br />DOZER <br />3.38 <br />Replace Topsoil from Stockpile to Pond RP -5a <br />DOZER <br />2.72 <br />Replace Topsoil from Stockpile to Drill Pads, <br />Ponds, Ditches <br />DOZER <br />22.91 <br />Replace Topsoil from Stockpile to Rock Dust <br />Facility <br />DOZER <br />0.20 <br />Replace Topsoil from Stockpile to Pond, Road, and <br />Laydown <br />DOZER <br />0.53 <br />Replace Topsoil from Stockpile to B -Seam Vent <br />Shaft and Road <br />SCRAPERI <br />0.62 <br />Replace Topsoil from Stockpile to Light Use Road <br />to RDH -3 <br />DOZER <br />0.17 <br />Replace Topsoil from Stockpile to B -Seam <br />Dewatering Area # 1 <br />DOZER <br />0.50 <br />Topsoil Replacement of the Upper Pond B Seam <br />#2 System <br />DOZER <br />13.46 <br />Plug and Seal 14 geotechnical holes <br />BOREHOLE <br />0.00 <br />Plug and Seal RS -13L <br />BOREHOLE <br />8.00 <br />Seal Portals and Vent Shafts <br />MINESEAL <br />160.00 <br />Seal and Abandon MR -171 Boreholes <br />BOREHOLE <br />10.00 <br />Plug and Seal All Boreholes <br />BOREHOLE <br />512.00 <br />Demolish and Remove All Structures <br />DEMOLISH <br />960.00 <br />Remove B Seam Dewatering System #2 Pond 5 to <br />Pond 3 Pipe <br />DEMOLISH <br />1.00 <br />Demolition of D -Seam Back-up Fan <br />DEMOLISH <br />2.00 <br />Drill Seeding - Large Permanent Areas <br />REVEGE <br />342.08 <br />Broadcast Seeding - Large Permanent Areas <br />REVEGE <br />34.00 <br />Drill Seeding - Small/Linear Areas <br />REVEGE <br />122.18 <br />$173 <br />$31 <br />$792 <br />$2,040 <br />$2,162 <br />$1,463 <br />$47 <br />$1,811 <br />$4,282 <br />$4,439 <br />$529 <br />$401 <br />$64,875 <br />$49,041 <br />$133,981 <br />$30,519 <br />$153,043 <br />$3,475 <br />$996 <br />$16,490 <br />$3,249 <br />$2,642 <br />$3,515 <br />$2,827 <br />$23,830 <br />$203 <br />$549 <br />$1,365 <br />$173 <br />$520 <br />$3,516 <br />$1,250 <br />$987 <br />$169,536 <br />$2,445 <br />$139,065 <br />$1,876,554 <br />$1,286 <br />$776 <br />$76,245 <br />$32,438 <br />$24,285 <br />