My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-14_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-03-14_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 8:48:24 AM
Creation date
3/15/2019 10:03:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
3/14/2019
Doc Name
Adequacy Review
From
Tabetha Lynch
To
Clayton Wein
Type & Sequence
RN7
Email Name
TNL
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Deserado Mine <br />PROJECT IDENTIFICATION <br />SCRAPER TEAM WORK <br />D -Portal Area <br />Permit Action: RN7 <br />Task #: 001 State: Colorado <br />Date: 2/12/2019 County: Rio Blanco <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Permit/Job#: C1981018 <br />Abbreviation: None <br />Filename: 001 <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraner Work Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $2,214.12 <br />MATERIAL OUANTITIES <br />Initial volume: 240,000 CCY Swell factor: 1.111 <br />Loose volume: 266,640 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$165.84 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$172.14 <br />NA <br />NA <br />NA <br />NA <br />NA <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$31.05 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$369.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$2,214.12 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $2,214.12 <br />MATERIAL OUANTITIES <br />Initial volume: 240,000 CCY Swell factor: 1.111 <br />Loose volume: 266,640 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br />HOURLY PRODUCTION <br />Material weight: <br />2,743 lbs/LCY <br />Material description: <br />User Provided <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />29.75 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.