permanent program lands that had received Phase I/II bond release under SL -01, SL03, SL -04, and SL - <br />05 for the Seneca II Mine. The SL -03 Phase III bond release was approved for 1,026 acres in May <br />2015. During the latter part of 2016, PSCM prepared an additional Phase III bond release application <br />as SL -04, covering approximately 422 acres of reclaimed lands, and submitted the application in mid- <br />January 2017. The SL -04 application was determined complete on February 22, 2017, a bond -release <br />inspection was conducted on August 3, 2017, and Phase III bond release was approved for 418 acres <br />on 06/21/18. <br />TABLE 13.1: REMAINING LIABILITY ACREAGE AND BOND STATU <br />PHASE I PHASE II PHASE IIIFULL BOND <br />REF <br />REMAINING REMAINING REMAINING RELEASE <br />PRE -LAW AREAS <br />SL -02 SC <br />67.4 <br />0 <br />1 0 <br />68.8 <br />INTERIM/PERMANENT PROGRAM AREAS <br />SL -01/03/04 SII <br />SL -01/03 SC <br />38.1 <br />90.2 <br />253.6 <br />1,444.0 <br />SL -04 SC <br />NEW PERMANENT PROGRAM AREAS <br />146.4 <br />146.4 <br />146.4 <br />0.0 <br />TOTALS <br />251.9 <br />236.6 <br />400.0 <br />1,512.8 <br />2018 DISTURBANCE AREA <br />In 2018, no additional acres were permitted to be disturbed, and no new disturbance occurred. The <br />annual disturbance status is reflected on the CDRMS Annual Report Form and is further described in <br />the text of this report. Refer to the 2018 Annual Report maps for the extent and status of the existing <br />mine disturbance. <br />During 2016-2017, approximately 60,000 tons of coal that had been stockpiled on-site from the initial <br />mine development work, was recovered and transported to the Foidel Creek Mine for processing, <br />loading, and transport to coal customers. Site activities during 2018 included ongoing mine <br />dewatering, transport to the Mine of salvaged conveyor structure and mechanical components from the <br />Williams Fork Mines for storage and potential future use, and repair of a leaking discharge pipe from <br />the Wadge Pond. <br />BACKFILLING AND GRADING <br />In 2018, no new areas were backfilled or graded. <br />SOIL MATERIAL MONITORING <br />PSCM is required by Permit C-09-087 to monitor soil handling operations for Seneca II Mine, <br />including soil salvage, storage, and redistribution. <br />• Soil Recovery Documentation <br />No soil material was salvaged during 2018 <br />2018 ARR <br />