Laserfiche WebLink
PEABODY SAGE CREEK 11�INE - 2018 ANNUAL RECLAMATION REPORT <br />INTRODUCTION <br />Peabody Sage Creek Mine (PSCM) received permit approval from the Colorado Division of <br />Reclamation Mining and Safety (CDkMS) on August 20, 2010 and began surface disturbance for the <br />construction of an underground mine in the summer of 2011. Development mining commenced at the <br />PSCM in the spring of 2012 using ithe continuous mining method. Mining in the Wadge Seam <br />extended from four separate entries tp approximately 600 feet before mining activities were idled in <br />the fall of 2012. The Mine has rem4ined on care and maintenance status since 2012, with activities <br />generally limited to monitoring, site maintenance, and revegetation success monitoring for reclaimed <br />areas. <br />The permit area contains 10,164 acres, of which approximately 1,844 acres were previously disturbed <br />by Seneca Coal Company. Within tho 1,844 previously disturbed/reclaimed acres, PSCM has utilized <br />or re -disturbed an area of approximately 356 acres for future mining and related activities. Within the <br />existing 356 -acre PSCM disturbance area, no additional disturbance occurred in 2018, and no <br />additional areas were disturbed. <br />Permitting actions during 2018 includedd approval of Permit Renewal RN15-01 (submitted 01/20/15) <br />on 02/01/18; approval of the Mid-TPermit Review (CDRMS Mid -Term — 02/13/18, Mid -Term <br />Responses — 04/30/18) on 05/18/18; and approval of Phased Bond Release SL -04 (submitted 01/16/17) <br />on 06/21/18. <br />2018 DISTURBANCE STATUS AND BOND RELEASE <br />Based on the CDRMS acreage accounting summary provided in the Division's comments on the 2014 <br />PSCM Annual Reclamation Report, a total of 1,844 acres, including both interim program and <br />permanent program areas for the fo er Seneca Mine (1,775 acres) and the new Sage Creek Mine (69 <br />acres), have been disturbed within the Sage Creek Permit Area, including: <br />• 1,628.8 interim program , nd permanent program acres previously permitted under the <br />Seneca II Mine Permit <br />146.4 Seneca II Phase III -released acres approved to be re -disturbed under the PSCM <br />Permit as new permanent program acres <br />68.8 new permanent <br />For the permitted Sage Creek Mine <br />permitted disturbance area acreages <br />Permit Area <br />Currently Permitted <br />PSCM submitted SL -01 and receive <br />acres of interim program and perma <br />SL -01 and SL -04 for the Seneca II <br />(01/30/14) for Phase I release on 67, <br />law areas under SL -02. In 2014, PS <br />2018 ARR <br />acres approved to be disturbed under the PSCM Permit <br />operations, the following summarizes the relevant permit and <br />10,164.0 acres <br />Area 356.4 acres (287.6 to be re -disturbed, 68.8 <br />new disturbance) <br />approval (09/05/13) for Phase II bond release in 2013 on 445.8 <br />-nt program lands that had received Phase I bond release under <br />Zine (C-80-005). PSCM also submitted and received approval <br />acres, and final bond release (Phase II/III) on 68.8 acres of pre - <br />M submitted SL -03 for Phase III bond release on 1,028 acres of <br />