Laserfiche WebLink
Soil Pits - Soil/Spoil Fertility and Quality <br />No new soil material placement occurred in 2018; therefore, no soil pits were established <br />and no soil/spoil quality samples were collected or analyzed. <br />Soil Balance <br />No soil salvage occurred in 2018. Therefore, as for the previous years (2013, 2014, 2015, <br />2016, 2017), the current soil material balance reflects an average soil replacement depth of <br />2 feet (24 inches). <br />Soil Salvage, Storage and Replacement <br />No soil material was repla ed in 2018. Stockpile A contains 91.2 acre-feet (147,150 cy) of <br />soil material. <br />'FABLETOPSOIL /VOLUMES <br />Stockpile Designation Volume (a c. <br />Stockpile A 191.2 <br />TOTAL 191.2 <br />'See 2013 Topsoil Removal Aj ap for Stockpile "A " location. <br />REVEGETATION <br />• Seeding and Shrub Planting <br />Table 12.2, PSCM Upland Area Seed Mix, and Table 12.3, PSCM Mesic Site Conditions <br />Seed Mix, reflect the species and seeding rates for the approved revegetation seed mixes. <br />Although no seeding was required in 2014 through 2018, supplemental broadcast seeding <br />was completed in 2014 for recently disturbed ditches, slopes near the portal, and selected <br />areas within the 356.4 are disturbance boundary to stabilize these areas and increase <br />vegetative cover. No shru s or trees were planted in 2018. <br />• Weed Control <br />Noxious weed surveys wee completed to identify areas of weed infestations on the PSCM <br />reclaimed areas in 2018. Targeted weed control spraying was conducted using selective <br />herbicide mixtures to control several identified species with thistle and hounds -tongue as <br />the primary targeted spy <br />toadflax. Weed control <br />follow-up treatment. <br />See Attachment B — <br />applications (actual log <br />small and adequately de <br />2018 report. Note that <br />perimeters were monitor <br />and secondary spraying of any areas of whitetop, mullen, and <br />will be monitored in 2019 for effectiveness and any necessary <br />N ed Control Logs, for details on the 2019 herbicide spray <br />is on file at the mine site). Since sprayed areas were relatively <br />c 'bed in the weed control log, a map will not be provided with the <br />the building perimeters (office, shop, etc.), substations, and road <br />-dj and sprayed as needed. <br />• Revegetation Success M <br />The CDRMS approved <br />success criteria of the <br />comprised of approximate <br />of SL -4 (Seneca II) in h <br />changed to that of the me <br />as described in Section 2. <br />nor Revision (MR -27) for minor changes to the vegetation <br />d waste disposal or landfill area. The landfill is an area <br />8.0 acres and was approved for Phase I Bond Release as a part <br />of 2010. PSCM proposed the vegetation success criteria be <br />recently disturbed areas associated with the underground mine <br />4 (Reclamation Plan).of the approved mine permit. As a result <br />2018 ARR 1 4 <br />