Laserfiche WebLink
Loader Worksheet Cont'd Task # 003 <br />Total Travel Time: 0.0247 <br />Total Cycle Time: 0.4997 <br />Load Bucket Capacity <br />Rated Capacity: 2.70 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other- rock/dirt mixtures (100-120%) 1.100 <br />Adjusted Capacity: 2.97 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6500 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: _ <br />Adjusted Hourly Unit Production: _ <br />Adjusted Hourly Fleet Production: <br />JOB TDIE AND COST <br />356.65 <br />296.02 <br />296.02 <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Page 2 of 2 <br />minutes <br />minutes <br />Fleet size: 1 Loader(s) Total job time: 392.32 Hours <br />Unit cost: $0.276 /LCY Total job cost: $32,009 <br />CIRCES Cost Estimating Software <br />