My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-25_PERMIT FILE - M2018055 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018055
>
2019-02-25_PERMIT FILE - M2018055 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
2/26/2019 3:50:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018055
IBM Index Class Name
Permit File
Doc Date
2/25/2019
Doc Name
Bond Calc.
From
DRMS
To
Eagle Rocks Aggregate, Inc.
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEEL LOADER — LOAD AND CARRY WORK <br />Task description: Topsoil <br />Site: Tower Pit <br />PROJECT IDENTIFICATION <br />Page 1 of 2 <br />Permit Action: New Permit Permit/Job#: M2018055 <br />Task #: 003 State: Colorado <br />Date: 2/14/2019 County: Eagle <br />User: SJM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 924H <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M055-003 <br />Horsepower: <br />128 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Operating Cost/Hour: <br />MATERIAL OUANTITIES <br />Initial volume: 116,133 CCY Swell factor: 1.000 <br />Loose volume: 116,133 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />Utilization % <br />Ownership Cost/Hour: <br />$18.97 <br />NA <br />Operating Cost/Hour: <br />$21.72 <br />100 <br />Operator Cost/Hour: <br />$40.90 <br />NA <br />Total Unit Cost/Hour: <br />$81.59 <br />(Cat HB <br />Total Fleet Cost/Hour: <br />$81.59 <br />0.040 <br />(Cat HB) <br />MATERIAL OUANTITIES <br />Initial volume: 116,133 CCY Swell factor: 1.000 <br />Loose volume: 116,133 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: <br />Unadjusted Basic Cycle Time (load, dump, maneuver): <br />0.475 <br />minutes <br />C cle Time Factors <br />Factor min. <br />Source <br />Material: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB <br />Truck Ownership: <br />Independently owned trucks 0.04 <br />0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net Cycle Time Adjustment: <br />0.000 <br />minutes <br />Adjusted Basic Cycle Time: <br />0.475 <br />minutes <br />Rolling Resistance Road Conditions <br />Haul: <br />Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Return: <br />Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul and Return Time <br />Length Grade Res. Rolling Total Res. Travel Time <br />(feet) % Res. (%) (%) <br />(minutes <br />Source <br />Haul Route: <br />25 0.00 2.00 2.00 <br />0.0123 <br />(Cat HB) <br />Return Route: <br />25 0.00 2.00 2.00 <br />0.0123 <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.