My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-25_PERMIT FILE - M2018055 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018055
>
2019-02-25_PERMIT FILE - M2018055 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
2/26/2019 3:50:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018055
IBM Index Class Name
Permit File
Doc Date
2/25/2019
Doc Name
Bond Calc.
From
DRMS
To
Eagle Rocks Aggregate, Inc.
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 002 Page 2 of 2 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.2924 <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />0.422 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.150 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Adjusted unit production: 386.96 LCY/hr <br />Adjusted fleet production: 386.96 LCY/hr <br />JOB TDIE AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.591/LCY <br />Total job time: 86.14 Hours <br />Total job cost: $19,685 <br />
The URL can be used to link to this page
Your browser does not support the video tag.