Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 <br />BULLDOZER WORK <br />Task description: Knock down highwall <br />Site: Tower Pit Permit Action: New Permit <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 2/14/2019 County: Eagle <br />User: SJM <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />I -shank ripper <br />Shift Basis: <br />I per day <br />Data Source: <br />CRG <br />Cost Breakdown: <br />DBMS <br />Page 1 of 2 <br />Permit/Job#: M2018055 <br />Abbreviation: None <br />Filename: M055-002 <br />Total unit Cost/Hour: $228.52 <br />Total Fleet Cost/Hour: $228.52 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$93.62 <br />NA <br />Operating Cost/Hour: <br />$73.35 <br />100 <br />Ripper own. Cost/Hour: <br />$12.36 <br />NA <br />Ripper op. Cost/Hour: <br />$7.67 <br />100 <br />Operator Cost/Hour: <br />$41.52 <br />NA <br />Total unit Cost/Hour: $228.52 <br />Total Fleet Cost/Hour: $228.52 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />33,333 <br />Swell factor: <br />1.000 <br />Loose volume: <br />33,333 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />55 feet <br />1,323.4 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />25% <br />6,500 feet <br />2,000 lbs/LCY <br />User Provided <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />1.100 <br />CAT HB) <br />Dozing method: <br />1.100 <br />50% SL) <br />Visibility: <br />1.000 <br />(AVG.) <br />