My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-25_PERMIT FILE - M2018055 (5)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018055
>
2019-02-25_PERMIT FILE - M2018055 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
2/26/2019 3:50:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018055
IBM Index Class Name
Permit File
Doc Date
2/25/2019
Doc Name
Bond Calc.
From
DRMS
To
Eagle Rocks Aggregate, Inc.
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Tower Pit <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Mob/demob <br />PROJECT IDENTIFICATION <br />Page 1 of 2 <br />Permit Action: New Permit Permit/Job#: M2018055 <br />Task #: 005 State: Colorado <br />Date: 2/14/2019 County: Eagle <br />User: SJM <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: M055-005 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0-25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 - <br />Operating <br />O eratin Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />He!per Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EOUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Description <br />Unit <br />Cost/hr/ unit <br />2 <br />(TONS) <br />$177.34 <br />Cat 315D L 8'-6" <br />19.05 <br />_ <br />$28.99 <br />Stick <br />$125.45 <br />$250.00 <br />Cat D8T - 8SU <br />52.21 <br />$105.98 <br />CAT 924H <br />12.69 <br />1 $18.97 <br />Haul Rig <br />Cost/hr/uni <br />t <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip <br />Cost/hr/ fleet <br />DOT Permit <br />Cost/ fleet <br />$88.67 <br />2 <br />$235.32 <br />$177.34 <br />$500.00 <br />$125.45 <br />1 1 <br />$231.43 <br />$125.45 <br />$250.00 <br />$88.67 <br />1 1 <br />$107.64 <br />$88.67 <br />$250.00 <br />Subtotals: $574.39 $391.46 $1,000.00 <br />ROADABLE EOUIPMENT: <br />Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br />unit Cost/hr/ fleet Cost/hr/ fleet <br />Subtotals: $0.00 $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.