My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-20_REVISION - M1985129
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985129
>
2019-02-20_REVISION - M1985129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 3:52:58 AM
Creation date
2/21/2019 8:52:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985129
IBM Index Class Name
Revision
Doc Date
2/20/2019
Doc Name
Request For Amendment To Permit
From
Christian Construction
To
DRMS
Type & Sequence
AM2
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) Earthmoving: <br /> Earth moving consists of first removing topsoil, then any overburden and finally <br /> aggregate(Little overburden is present with an average depth of 6-12".)The resource <br /> lies beneath the topsoil at most locations.) Once mining is nearing completion,the final <br /> slopes will be mined at a 3H:IV slope. These slopes will then have topsoil placed for <br /> reclamation. <br /> (c) Water diversions and impoundment: <br /> There are no water diversions or impoundments planned forthe mining area. <br /> (d) The sizeof the areas)to be worked at any one time: <br /> Total acres to be stripped in a given year will range from 8 to 20.5 acres,dependent upon <br /> market demand. <br /> (e) An approximate timetable todescribethe mining operation: <br /> This is an ongoing mining operation.The expected life of the mining area is 10 to 20 <br /> years,depending on market demand. We estimate the amount of mineable acres by phase <br /> is as fbllows: <br /> Table I: Phase,Mineable Acres and Timetable <br /> Phase Approximate Mineable Approximate <br /> Acres Production Period <br /> -Years <br /> A* 20.29 3-5 years <br /> B 13.79 2-4 years <br /> C 8.58 1-2 years <br /> D 10.78 2-4 years <br /> 1. 15.01 3-5 years <br /> * Phase A includes about 12 acres ofunntined area in theexisting 112 Construction <br /> Materials pen-nit. The actual added area for Phase A is approximately 8 acres. <br /> (i) An estimate of the periods of time which will he required for the various <br /> phases: <br /> Please see the above Table 1. <br /> (ii)Adescription of thesize and location of each area to beworked duringeach <br /> phase: <br /> Please see the Pre-mine/Mine Plan map and the above Table 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.