Laserfiche WebLink
EXHIBIT G—Water Information (Rule 6.4.7): <br /> 22. Is the northern boundary of the proposed permit in the floodplain of the Huerfano <br /> River? Review of available FIRM Panels indicates that the north boundary of the <br /> site is not within a "Special Hazard Flood Zone A". However, Dog Arroyo is. <br /> EXHIBIT H—Wildlife Information(Rule 6.4.8): <br /> 23. Please forward any recommendations from Colorado Department of Wildlife to the <br /> Division if/when any are received. Letter from CDOW added to submittal and <br /> requirements acknowledged. <br /> EXHIBIT J—Vegetation Information(Rule 6.4.10): <br /> 24. As mentioned previously in number 5,the vegetation inventory table does not match <br /> the table provided in Soil and Vegetation Map in Exhibit C, please make the tables <br /> consistent. Revised <br /> 25. As part of Rule 6.4.10(e) please provide the estimates of carrying capacity for <br /> rangelands on or in the vicinity of the affected land. Added <br /> EXHIBIT L—Reclamation Costs (Rule 6.4.12): <br /> 26. The first line item in the reclamation cost estimate is for overburden. Please clarify <br /> how thick the overburden is at the site, how the volume stated was calculated and indicate <br /> on the appropriate maps where the overburden stock piles will be located. Overburden <br /> item removed. No overburden is anticipated. <br /> EXHIBIT M—Other Permits and Licenses (Rule 6.4.13): <br /> 27. A copy of the Conditional Use Permit in Huerfano County, CUP #18-015, was not <br /> provided as indicated. Please provide a copy of the permit. Included in this submittal <br /> EXHIBIT N—Source of Legal Right to Enter (Rule 6.4.14): <br /> 28. During review of this section the Division would like to bring to the attention of the <br /> Operator/Applicant that the current lease agreement is set to expire on February 2, 2020. <br /> It is the responsibility of the Operator/Applicant to maintain Legal Right of Entry at all <br /> times during mining and the Division requires a copy of any updated agreements. <br /> Acknowledged <br /> page 4 of 5 file(J:\2018\2018-088\AdequacyReviews'Reviewl\Franciscotti2-adequacy-response-l.doc) <br />