Laserfiche WebLink
EXHIBIT S —Permanent Man Made Structures (Rule 6.4.19): <br /> 29. In the section labelled Site 2, the Dan Mahan Ditch is misspelled please make <br /> consistent with labels on the maps. Additional clarification is needed on when the ditch <br /> may be in use and please clarify when the ditch is active will all mining at the site cease <br /> or will mining activity move away from the ditch, this narrative also needs to be added to <br /> the Mining Plan? Added buffer to plan <br /> 30. Please provide structure agreement for the county roads that border the site on two <br /> sides as they are within 200 feet of proposed mining activity. Included in this submittal <br /> If you have any questions,please email (jvg(&incasys.com) or call me 719-547-7073. <br /> Cordially, <br /> Joseph V. Gagliano P.E. <br /> Gagliano Engineering, Inc. <br /> page 5 of 5 file(J:\2018\2018-088\AdequacyReviews\Reviewl\Franciscotti2-adequacy-response-I doc) <br />