front-end loaders, scrapers, excavators, etc. <br />(c) Water diversions and impoundments will be done in a way to prevent erosion <br />and sedimentation going into the Dan Mahan ©itch. Care will be taken while <br />mining to divert the storm water to the earthen berms that will be constructed to <br />control the speed of the run off and yet maintain a flow as required. <br />(d) The size of area that will be worked at any one time, follows: <br />Phase 1A) <br />46.7 <br />Acres <br />Phase 1 B) <br />37.1 <br />Acres <br />Phase 2) <br />95.6 <br />Acres <br />Phase 3) <br />93.1 <br />Acres <br />Phase 4) <br />66.5 <br />Acres <br />PLEASE SEE EXHIBIT "C" MINING MAP. <br />(e) All times in the timetable are dependent upon market conditions. The mining <br />timetable is as follows. <br />PHASE 1A: 46.7 ACRES <br />START MINING January OF 2019, AND TAKE FOUR (4) YEARS TO MINE, <br />2019-2023. <br />PHASE 1B: 37.1 ACRES <br />MINING IS TO START AFTER PHASE lA & PLANS TO TAKE FIVE (5) <br />YEARS TO MINE, 2023-2028. <br />PHASE 2: 95.6 ACRES <br />MINING IS TO START AFTER PHASE 1B & PLANS TO TAKE TWELVE (12) <br />YEARS TO MINE, 2028-2040. <br />PHASE 3: 93.1 ACRES <br />MINING IS TO START AFTER PHASE 2 & PLANS TO TAKE TWELVE (12) <br />YEARS TO MINE, 2040-2052. <br />PHASE 4: 66.5 ACRES <br />MINING IS TO START AFTER PHASE 4 & PLANS TO TAKE TEN (10) <br />YEARS TO MINE, 2052-2062. <br />ALL DATES ARE DEPENDENT ON MARKET DEMAND. <br />RECLAMATION WILL BE DONE CONCURRENTLY WITH MINING. <br />