Laserfiche WebLink
RECLAMATION PLAN EXHIBIT E (cont) <br /> sloping is complete the salvaged soil will be spread over the <br /> area to be seeded an average of 12 inches deep on the north area. <br /> For the existing permit area and south, any soil salvaged from <br /> the south area will be respread for revegetation. <br /> The plan calls for revegetating the mined area using the NRCS <br /> recommendations provided in the original permit EXHIBITI/J (a copy <br /> is provided in the exhibit for reference) . The NRCS recommended <br /> using a seed drill with 6 . 5 inch spacing and a planting depth of <br /> 1/ to f inch from October 15 to May 20th of each year. No fertil- <br /> izer or mulch was recommended and spring weed control using <br /> herbicides and/or mowing in spring to mid-summer. <br /> The following seed mix was recommended and approved for use at <br /> the mine . <br /> Species Lbs . PLS/Acre* <br /> Sand bluestem (Eiida) 2 . 40 <br /> Prairie Sandreed (goshen) 0 . 88 <br /> Switchgrass (greenville) 0 . 50 <br /> Yellow Indian grass (Llano) 0 . 83 <br /> Little Bluestem (Pastura) 0 . 35 <br /> TOTAL 12 . 50 <br /> * If broadcast the seed rate is to be doubled <br /> Under normal conditions, the operator will strive for a 20 to 40 <br /> percent cover rate on the revegetated areas when reclamation is <br /> complete . Careful analysis of the growth medium and salvageable <br /> soil will permit the operator to implement a soil additive <br /> program and to monitor the prescribed seeding plan to determine <br /> if the plan requires revision. Under normal weather conditions, <br /> an adequate moisture reserve will be present for establishment of <br /> the proposed seed mixture . No irrigation will be used during <br /> reclamation since the plan is to establish a vegetation cover <br /> that is not dependent on irrigation to survive . <br /> RECLAMA TION PERFORMANCE STANDARDS <br /> The property will be mined in compliance with the Reclamation <br /> Performance Standards of Rule 6 . Grading will be performed to <br /> create a final topography that is compatible with the intended <br /> final land use. Final external slopes will be graded no steeper <br /> then 2h to lv as provided for in the Rules and Regulations . The <br /> RECLAMATION PLAN MAP shows how the area will be reclaimed. <br /> 9 <br />