Laserfiche WebLink
RECLAMATION PLAN EXHIBIT E (cont) <br /> Imported fill materials may be used to fill part of the excavated <br /> area and level the mine floor. This material may consist of <br /> broken concrete or other materials suitable for that purpose . It <br /> will be "Inert Material" as defined by the Colorado Department of <br /> Health. The pit will be reclaimed so that a suitable grade for <br /> drainage exists, all surface runoff will be directed so it <br /> remains on the mine site . <br /> All grading will be done in a manner to control erosion and to <br /> protect areas outside the affected land from slides or other <br /> damage . Backfilling and grading will be completed as soon as <br /> feasible after mining is completed in a given area. All refuse <br /> will be hauled away or disposed of in a manner that will control <br /> unsightliness and protect the drainage system from pollution. <br /> There are no acid-forming or toxic materials involved in this <br /> operation. The minimal amounts of petroleum products stored at <br /> the site will be done as prescribed by applicable laws . The <br /> storage tanks have secondary containment features and a Spill <br /> Prevention and Containment Plan has been prepared for the fueling <br /> facility. There are no drill or auger holes on the land. <br /> Maximum slopes will be within the limits set forth in the Rules <br /> and Regulations of the Board and will be capable of being tra- <br /> versed by machinery. <br /> The operator does not expect prevailing hydrologic conditions to <br /> be disturbed. We will comply with applicable Colorado water laws <br /> and regulations (as the operator understands them) governing <br /> injury to existing water rights in order to minimize any distur- <br /> bance, which might occur to the prevailing hydrologic balance of <br /> the affected land and surrounding areas and to the quality of <br /> water in surface and ground-water systems both during and after <br /> the mining operation and during reclamation. In addition, the <br /> operator expects to comply with applicable Federal and Colorado <br /> water quality laws and regulations . Any water used in the <br /> operation or the processing plant will come from water owned by <br /> the operator or purchased from an outside agency that is approved <br /> for that use . EXHIBITG contains specific information concerning <br /> impacts and uses of water at this mining operation. <br /> This is not a dredge facility, so there are no temporary silt- <br /> ation structures involved in this operation and no mining will be <br /> done within the confines of the Kiowa Creek channel . If needed a <br /> U. S . Army Corp of Engineers Permit is required for mining in <br /> 10 <br />