Laserfiche WebLink
Snowcap Coal Company, Inc. -2- 2018 Annual Reclamation Report <br /> <br />on 2.1 acres in 2015; and 1.8 acres in 2017) <br />Roadside North Portal Mine Facilities, Stockpile Areas, G Substation 26.6 <br /> and Sedimentation Control features (incl Pond 13) (No. 22 Below) <br /> (Ph III release on 21.1 acres in 2015; and 5.5 acres in 2017) <br />Substation B (No. 23 Below) 0.3 <br />No. 2 West Portals (No. 24 Below) (Ph III release on 0.7 acres in 2015) 0.7 <br />Cameo Refuse Disposal Area No. 2 Topsoil Piles (No. 25 Below) (Ph III 2.9 <br />release on 2.9 acres in 2015) <br /> Conveyor Corridor from Xcel Culvert north to Haul Road #3 (No. 26 Below) 2.7 <br /> (Ph III release on 0.5 acres in 2009 and 2.2 in 2011) <br />Conveyor Corridor from Xcel Culvert south to Transfer Bldg #2 and east of 1.6 <br /> Colorado River (No. 27 Below) (Ph III release on 1.3 acres in 2009) <br />Substation A (No. 28 Below) 0.2 <br />Roadside South Portal Mine Facilities, Stockpile/Prep Plant Area, Conv 14.4 <br /> Tunnel under I-70, Pond 8 & Pond 9 (No. 29 Below) (Ph III release <br /> on 13.5 acres in 2010 and 0.9 acres in 2017) <br />Roadside South Portal Road to Old Upper Diversion Ditch (No. 30 Below) 1.9 <br /> (Light Use Road #1) <br />Railroad Loop Track - South of I 9/10 Road (No. 31 Below) 0.3 <br /> (Ph III release on 0.3 acres in 2009) <br />Cameo Refuse Disposal Area No. 1 Road (No. 32 Below) 1.2 <br /> (Ph III release on 1.2 acres in 2017) <br />Unit Train Load-out, Railroad Loop Track/Conveyor Corridor & Roads 66.7 <br /> (No. 33 Below) (Ph III release on 66.7 acres in 2011) <br />Cameo Refuse Disposal Area No 1 & 2 Sediment Ponds (6 & 10) <br /> (No. 34 Below) (Ph III release on 2.4 acres in 2017) 2.4 <br />Total 227.8 <br /> <br />Areas permanently disturbed are as follows: <br /> <br /> Description <br />Access Road #2 (No. 5 Below) (Ph III release on 0.2 acres in 2015) 0.4 <br />North Decline Diversion Ditches, 12” V-ditch & 12” CMP (No. 5 Below) 1.3 <br />(Ph III release on 0.3 acres in 2015) <br />Coal Gulch Realignment (No. 20 Below) (Ph III release on 1.4 acres 1.4 <br />in 2015) <br />Access Road to No. 2 West Portals (No. 21 Below) (Ph III release on 3.8 <br />3.8 acres in 2015) <br />North Portal Upper Diversion Ditch (No. 22 Below) (Ph III release on 1.4 1.4 <br />acres in 2015) <br />Top Soil Pile #2 (No. 22 Below) (Ph III release on 0.3 acres in 2015) 0.3 <br />Haul Road #3 at UTL (No. 33 Below) (Ph III release on 0.9 acres in 0.9 <br /> 2011) <br />Coal Creek Realignment (No. 34 Below) (Ph III release on 0.8 acres 0.8 <br />in 2015) <br />Haul Roads to CRDA 1, 2 and 3 (No. 35 Below) (Ph III release on 3.4 <br /> acres in 2015) 3.4 <br />Total 13.7 <br /> <br />