Laserfiche WebLink
Snowcap Coal Company, Inc. -3- 2018 Annual Reclamation Report <br /> <br />Acres Disturbed by Mining Activities 241.5 <br />Less Previously Reclaimed Areas 227.8 <br />Less Permanently Disturbed Areas 13.7 <br />Equals Remaining Reclamation Acres 0.0 <br /> <br />(c) Area backfilled and graded – 0 acres during 2018. <br /> <br />(d) Area Top-soiled – 0 acres during 2018. <br /> <br />(e) Area Seeded – 0 acres during 2018. <br /> <br />(f) Whitetop was treated in May, using Curtail, at North Decline’s West Diversion <br />Ditch, Conveyor Corridor and the east portion of Light Use Road #1. <br /> <br />(g) Areas Seeded up through 2018. (Permanent) <br />1. Blue Flame Mine - Deleted - Reclamation work was performed voluntarily <br />and therefore not required for this report. <br /> <br />2. Permanent Flood Control Dike - between the overland conveyor and the <br />river (see Permanent Flood Control Dike - TR01, Volume 7). Phase I <br />Bond Release was approved on 2.8 acres with SL-2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 2.8 acres with SL-7 on April <br />26, 2011. Located in SW¼SE¼, Section 27, T10S, R98W, 6th P.M. <br />Area - 2.8 acres <br /> Date - Fall 1985 <br /> Seed Mix - No seed mix information on file. <br /> Phase III Bond Release - 2.8 acres <br /> <br />3. South Lease Exploration - drill pads and access roads to drill holes <br />PCC-04 through PCC-10 (see South Lease Exploration Plan - TR04, <br />MR10 and MR11, Volume 8). Phase I Bond Release was approved on <br />4.0 acres with SL-2 on October 27, 2003. Phase II & III Bond Release <br />was approved on 4.0 acres with SL-8 on November 14, 2015. Located in <br />Section 12 and 13, T11S, R98W, 6th P.M. Reference Exhibit SL-07-021. <br />Area - 4.0 acres. <br />Date - Fall 1985 <br />Seed Mix - No seed mix information on file. <br />Phase III Bond Release – 4.0 acres <br /> <br />4. South Lease Exploration - drill pads and access roads to drill holes <br />PCC-01 through PCC-03 and access road from Colorado Ute <br />power line to PCC-09 turnoff (see South Lease Exploration Plan - TR04, <br />MR10 and MR11, Volume 8). Phase I Bond Release was approved on <br />3.0 acres with SL-2 on October 27, 2003. Phase II & III Bond Release <br />was approved on 3.0 acres with SL-8 on November 14, 2015. Located in <br />Section 12 and 13, T11S, R98W, 6th P.M. Reference Exhibit SL-07-021. <br />Area - 3.0 acres. <br />Date - Spring 1986 <br /> Seed Mix - No seed mix information on file. <br /> Phase III Bond Release – 3.0 acres