My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-13_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2019-02-13_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 7:45:38 AM
Creation date
2/14/2019 7:39:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/13/2019
Doc Name
Annual Reclamation Report
From
J. E. Stover & Associates, Inc
To
DRNS
Annual Report Year
2018
Permit Index Doc Type
Annual Reclamation Report
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -6- 2018 Annual Reclamation Report <br /> <br /> Seed Mix - “Seed Mix, Table 14-10” <br /> “Seed Mix, Table 14-12” <br /> Phase III Bond Release – 7.5 acres <br /> <br />10. Cameo Borrow Area No. 1 - Borrow area east of CRDA 1 which was <br />used for refuse pile cover material. 0.2 acres of Cameo Borrow Area No. <br />1 was re-disturbed in 2002 and then reclaimed and re-seeded. Phase I <br />Bond Release was approved on 2.5 acres with SL-2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 2.5 acres with SL-8 on <br />November 14, 2015. Located in the SE¼, Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 2.5 acres <br /> Date - 1.2 acres in July 1994; 1.8 acres in December 1994; (0.2 acres re- <br /> seeded in April 2002) <br /> Seed Mix - “Seed Mix, Table 14-10”; (Re-seed “Seed Mix, Table 14-13”, <br /> Upland Components) <br /> Phase III Bond Release – 2.5 acres <br /> <br /> CBA #1 Sump (sedimentation control feature) - backfilled, <br /> top-soiled and seeded. Phase I Bond Release was approved on 0.3 acres <br /> with SL-8 on November 14, 2015. Phase II & III Bond Release was <br /> approved on 0.3 acres with SL-9 on January 3, 2017. <br /> Area – 0.3 acres <br /> Date – October 2012 <br /> Seed Mix - “Seed Mix, Table 14-8”, Upland Components <br /> Phase III Bond Release – 0.3 acres <br /> <br />11. Cameo Refuse Disposal Area No. 1 (Misc) - Topsoil Piles 5 and 6, <br />Salvage Area 3, and the temporary haul road from Cameo Borrow Area <br />No. 2. Phase I Bond Release was approved on 2.2 acres with SL-2 on <br />October 27, 2003. Phase II & III Bond Release was approved on 2.2 <br />acres with SL-8 on November 14, 2015. Located in the SE¼, Section 28, <br />T10S, R98W, 6th P.M. <br /> Area - 2.2 acres <br /> Date - July 1994 <br /> Seed Mix - “Seed Mix, Table 14-10” <br /> Phase III Bond Release – 2.2 acres <br /> <br />12. South Fan - Overburden stockpiles 10 and 11, south fan borrow area and <br />portion of access road no. 3. Reference map SL-16-009. Phase I Bond <br />Release was approved on 0.9 acres with SL-2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 0.9 acres with SL-8 on <br />November 14, 2015. Located in the NE¼, Section 2, T11S, R98W, 6th <br />P.M. <br /> Area - 0.9 acres <br /> Date - October 2000 <br /> Seed Mix - “Seed Mix, Table 14-6” <br /> Phase III Bond Release – 0.9 acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.