Laserfiche WebLink
Snowcap Coal Company, Inc. -7- 2018 Annual Reclamation Report <br /> <br />13. 2 West Portals - Portals & Overburden stockpile 13. Reference Exhibit <br />58. The two steep sloped portal areas were extensively roughened and <br />re-seeded due to poor establishment of vegetation from the 2000 seeding. <br />Phase I Bond Release was approved on 0.3 acres with SL-2 on October <br />27, 2003. Phase II & III Bond Release was approved on 0.3 acres with <br />SL-8 on November 14, 2015. Located in the NE¼, Section 11, T11S, <br />R98W, 6th P.M. <br /> Area - 0.3 acres <br /> Date - October 2000; (0.2 acres re-seeded in October 2005) <br /> Seed Mix - “Seed Mix, Table 14-6”; (Re-seed “Salt Tolerant Seed Mix, <br /> Table 14-15”) <br /> Phase III Bond Release – 0.3 acres <br /> <br />14. North Decline Mine Dewatering System - Permanent Mine Dewatering <br />Point installed and reclaimed during 2002. Phase I Bond Release was <br />approved on 0.5 acres with SL-2 on October 27, 2003. Phase II & III Bond <br />Release was approved on 0.5 acres with SL-8 on November 14, 2015. <br />Located in E½NE¼ and NE¼SE¼, Section 34, T10S, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - April 2002 <br /> Seed Mix - “Seed Mix, Table 14-13”, Upland Components <br /> Phase III Bond Release – 0.5 acres <br /> <br />15. Roadside Refuse Borrow Area - Area east of the Roadside Refuse Pile <br />excavated during 2002 for cover material for the Roadside Refuse Pile. <br />Phase I Bond Release was approved on 4.5 acres with SL-2 on October <br />27, 2003. Phase II Bond Release on 4.5 acres and Phase III Bond <br />Release on 3.4 acres were approved with SL-8 on November 14, 2015. <br />Located in SE¼ Section 34, T10S, R98W, 6th P.M. <br />Area – 4.5 acres <br /> Date - November 2002 <br /> Seed Mix - “Seed Mix, Table 14-8”, Upland Components <br /> Phase III Bond Release – 3.4 acres <br /> <br />16. Roadside Refuse Disposal Area (including new Upper Diversion <br />Ditch) - Re-contoured the refuse pile and placed 20” of cover material and <br />6” of topsoil on all slopes and benches. Seeded with approved seed mix <br />during November. Phase I Bond Release was approved on 7.1 acres with <br />SL-2 on October 27, 2003, and 1.3 acres with SL-4 on January 11, 2009. <br />The 1.3 acres achieved final Phase II & III Bond Release with SL-6, <br />approved on Dec. 14, 2010. Phase II & III Bond Release was approved <br />on 7.1 acres with SL-8 on November 14, 2015. Located in the SE¼ <br />Section 34, T10S, R98W, 6th P.M. <br />Area - 8.4 acres <br />Date - November 2002 <br /> Seed Mix - “Seed Mix, Table 14-8”, Upland Components <br /> Phase III Bond Release – 8.4 acres <br /> <br />