Laserfiche WebLink
Snowcap Coal Company, Inc. -5- 2018 Annual Reclamation Report <br /> <br /> access road #2 at the North Decline, 0.4 acres, is approved as a <br /> permanent feature. Phase I & II Bond Release on 1.7 acres and <br /> Phase III Bond Release on 0.5 acres were approved with SL-8 on <br /> November 14, 2015. Located in the N½NE¼, Section 34 and the <br /> NW¼NW¼, Section 35, T10S, R98W, 6th P.M. <br /> Area – 1.7 Acres <br /> Phase III Bond Release – 0.5 acres <br /> <br />6. North Decline - treatment building, A-substation and power line between <br />A and A-substations. Phase I Bond Release was approved on 0.1 acres <br />with SL-2 on October 27, 2003. Phase II & III Bond Release was <br />approved on 0.1 acres with SL-8 on November 14, 2015. Located in <br />E½NE¼ and NE¼SE¼, Section 34, T10S, R98W, 6th P.M. <br />Area - 0.1 acres <br /> Date - Spring 1993 <br /> Seed Mix -“Seed Mix, Table 14-9” <br /> Phase III Bond Release – 0.1 acres <br /> <br />7. NW Intake Portal - Backfill portal located in NW¼NE¼, Section 34, T10S, <br />R98W, 6th P.M. Phase I Bond Release was approved on 0.1 acres with <br />SL-2 on October 27, 2003. Phase II & III Bond Release was approved on <br />0.1 acres with SL-8 on November 14, 2015. <br /> Area - 0.1 acres <br /> Date - Summer 1993 <br /> Seed Mix - No seed mix information on file. <br /> Phase III Bond Release – 0.1 acres <br /> <br />8. Cameo Refuse Disposal Area No. 1 - Covered benches 1, 2, & 3. Phase <br />I Bond Release was approved on 10.3 acres with SL-2 on October 27, <br />2003. Phase II & III Bond Release was approved on 10.3 acres with SL-8 <br />on November 14, 2015. Located in the SE¼ Section 28, T10S, R98W, 6th <br />P.M. <br /> Area - 10.3 acres <br /> Date - July 1994 <br /> Seed Mix - “Seed Mix, Table 14-10” <br /> Phase III Bond Release – 10.3 acres <br /> <br />9. Cameo Refuse Disposal Area No. 2 - Covered benches 1, 2, 3, and the <br />part of 4 south of the road. Inter-seeded previously seeded benches 1, 2, <br />3 and the part of 4 south of the road per the recommendation of the 2001 <br />vegetation study entitled Revegetation Evaluation re: Diversity, Cedar <br />Creek Associates, Inc., September 2001. Phase I Bond Release was <br />approved on 7.5 acres with SL-2 on October 27, 2003. Phase II & III Bond <br />Release was approved on 7.5 acres with SL-8 on November 14, 2015. <br />Located in the SE¼, Section 28 and the SW¼, Section 27, T10S, R98W, <br />6th P.M. <br />Area - 7.5 acres <br />Date - Benches 1 & 2 in July 1994 and benches 3 & 4 in December 1994; <br /> November 2001 inter-seed