Laserfiche WebLink
Page 1 of 4 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Backfill boxcut mine area and ponds <br /> Site: Willow Creek Mine Permit Action: AM-3 Permit/Job#: M1983011 <br /> PROJECT IDENTIFICATION <br /> Task#: O 1 A State: Colorado Abbreviation: None <br /> Date: 10/12/2018 County: Lake Filename: MO11-Ola <br /> User: DMC <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 730 <br /> -Loader: CAT 950H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: Water Tanker,5,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support E ui ment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA NA NA 25 <br /> Ownership cost/hour: $57.82 $26.14 NA NA NA $25.30 <br /> Operating cost/hour: $44.78 $30.84 NA NA NA $9.15 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA $0.00 <br /> Ripper op.cost/hour: NA $0.00 NA NA NA $0.00 <br /> Operator cost/hour: $30.37 $40.90 NA NA NA $0.00 <br /> Unit Subtotals: $132.96 $97.89 NA NA NA $34.45 <br /> Number of Units: 2 1 0 0 0 1 <br /> Group Subtotals: Work: $363.81 Support: $0.00 Maint: $34.45 <br /> Total work team cost/hour: $398.26 <br /> MATERIAL QUANTITIES <br /> Initial volume: 59,355 CCY Swell factor: 1.000 <br /> Loose volume: 59,355 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,650 Pounds/LCY <br /> Description: Decomposed rock-25%Rock,75%Earth <br /> Rated Payload: 62,000 Pounds <br /> CIRCES Cost Estimating Software <br />