My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-30_REVISION - M1983011
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983011
>
2019-01-30_REVISION - M1983011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:56 PM
Creation date
1/30/2019 10:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983011
IBM Index Class Name
Revision
Doc Date
1/30/2019
Doc Name
Returned Mail
From
DRMS
To
Mt. Elbert Mining
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task#01A Page 2 of 4 <br /> Payload Capacity: 23.40 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 17.10 LCY <br /> Heaped Volume: 22.10 LCY <br /> Average Volume: 19.60 LCY <br /> Adjusted Volume: 22.10 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 20.96 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 4.300 LCY(heaped) <br /> Bucket Fill Factor: 0.975 Loose material-mixed moist aggregates 95-100% 0.975 <br /> Adjusted Capacity: 4.193 LCY <br /> Job Condition Corrections: Site Altitude(ft.):9600 feet <br /> Truck Loader Source <br /> Altitude Ad': 0.900 1.000 CAT HB) <br /> Job Efficiency: 0.830 0.830 AT HB <br /> Net Correction: 0.747 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 5 passes <br /> Excavators and Front Shovels: <br /> Truck: <br /> Machine Cycle Time vs.Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump, 0.500 minutes <br /> maneuver): <br /> Cycle Time Factors Factor min. Source <br /> Material: Mixed material 0.02 0.020 Cat HB <br /> Stockpile: Conveyor or dozer piled 10 ft.high and up 0.000 (Cat HB) <br /> 0.00 <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation- Constant operation-0.04 -0.040 Cat HB <br /> Dump Target: Nominal target 0.00 0.000 Cat HB <br /> Net Cycle Time Adjustment: -0.060 minutes <br /> Adjusted Loader Cycle Time: 0.440 minutes <br /> Net Load Time per Truck: 1.860 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.667 Minutes <br /> Truck Load Time: 1.860 Minutes Adjusted for site altitude: 1.860 Minutes <br /> Truck Maneuver and Dump 1.00 Minutes Adjusted for site altitude: 1.111 Minutes <br /> Time: <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.