My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-26_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2018-12-26_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:54 PM
Creation date
12/27/2018 4:02:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/26/2018
Doc Name Note
Part 2 of 2
Doc Name
Addendum To Application
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project:VLF2 Crushed Ore Stockpile Removal <br /> NewFields Project Number: 475.0106.030 <br /> Date: December 06, 2018 <br /> S M T W r F S <br /> �x <br /> Temperature: Low: 17°F to High: 28°F <br /> Weather: Clear-Cold <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames started excavating the potholes to expose the liner at designated locations on slope <br /> area between benches at approximate elevation of 10020' and 9960'. <br /> Ames used a 312 Cat excavator equipped with a bucket with a rubber blade to excavate to <br /> approximately 4-inches above the synthetic liner. Ames provided three spotters using flat <br /> shovels to locate and expose the synthetic liner. <br /> Foresight West Surveying Inc. was on site today to stake out all the potholing locations (#1 <br /> through #34). A wooden stake was set at each location marked with the pothole number. <br /> Ames excavated potholes#1, #7, #16, #17, and #18 through #34. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel continuously monitored the pothole excavations ensuring that proper <br /> procedures were used to prevent damage to the synthetic liner. Upon exposure of the <br /> synthetic liner a thorough visual inspection was performed to confirm liner integrity. No <br /> damage or movement of the liner was detected on all potholes excavated today. <br />
The URL can be used to link to this page
Your browser does not support the video tag.