Laserfiche WebLink
Daily Report <br /> VLF2 Crushed Ore Stockpile Removal <br /> 475.0106.030 ■ <br /> December 05,2018 <br /> Morning discussion with Kevin of Ames. Ames to complete removal of the ore material on to <br /> the lower bench; would maintain a minimum thickness over the liner of 2.0 ft. <br /> 4.0 PHOTO <br /> + #':tom lf #-., <br /> Figure 1. Ames removing ore down on to the lower bench, looking south. <br /> NewFields Mining Design &Technical Services <br /> Prepared by: <br /> Jose Armenta, CQA Monitor. <br /> jarmenta@ext.newfields.com Cell: 775-388-7756 <br />