Laserfiche WebLink
â– NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Crushed Ore Stockpile Removal <br /> NewFields Project Number: 475.0106.030 <br /> Date: December 05, 2018 <br /> S M T WT F S <br /> Temperature: Low: 14°F to High: 36°F <br /> Weather: Clear-Cold <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 7 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames continued removing the ore material from slope area between benches at approximate <br /> elevation of 10020' and 9960'. The ore was stockpiled at the lower bench using a CAT D6T <br /> LGP dozer equipped with GPS. <br /> Ames stopped work at 1400 hrs today upon completing the removal of the ore over the 2- <br /> foot of drain cover fill. Ames would start potholing tomorrow Thursday 12/6. The surveyor <br /> will stake out potholing locations early in the morning. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel continuously monitored the ore being pushed down and stockpiled past <br /> the toe of the lower bench ensuring that proper procedures were used to prevent damage to <br /> the underlying synthetic liner. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> Attended the daily morning safety meeting conducted by Ames in the field at 0645 hrs. <br />