Laserfiche WebLink
Daily Report <br /> VLF2 Crushed Ore Stockpile Removal <br /> 475.0106.030 ■ <br /> December 04,2018 <br /> Ames stopped work at 1500 hrs today upon completing the removal of the ore down to three <br /> foot total thickness over the synthetic liner. Ames would start removing the top one foot of <br /> ore over the two foot drain cover fill (DCF) tomorrow Wednesday 12/5. <br /> Kevin stated that Ames would proceed to cut the one foot of ore left over the two foot DCF <br /> starting tomorrow morning. Kevin reiterated that the reason for leaving that one foot ore <br /> over the DCF was to minimize possible frosting of the DCF and that frosting would increase <br /> the risk of damaging the liner. <br /> 4.0 PHOTO <br /> arm-"'''. — .�.,s�`MM�` ` �-°-_ .,�„1aFy�.•—. _. _ <br /> or <br /> �' Mom; ?}' 1 ipp..��__"#y►+- ¢ ii . »} .a. ,,;r .i.,i- <br /> Figure 1. Ames removing ore down on to the lower bench, looking southwest. <br /> NewFields Mining Design &Technical Services <br /> Prepared by: <br /> Jose Armenta, CQA Monitor. <br /> jarmenta@ext.newfields.com Cell: 775-388-7756 <br />