Laserfiche WebLink
NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek & Victor Gold Mining Company <br /> Project: VLF2 Crushed Ore Stockpile Removal <br /> NewFields Project Number: 475.0106.030 <br /> Date: December 04, 2018 <br /> S M T W T F S <br /> Temperature: Low: 6°F to High: 19°F <br /> Weather: Clear-Cold <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 8 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames continued removing ore material from area between benches at approximate elevation <br /> of 10020' and 9960'.The ore is being stockpiled at the lower bench using a CAT D6T LGP dozer <br /> equipped with GPS. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel continuously monitored the ore being pushed down and stockpiled past <br /> the toe of the lower bench ensuring that proper procedures were used to prevent damage to <br /> the underlying synthetic liner. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> Attended the daily morning safety meeting conducted by Ames in the field at 0645 hrs. <br /> Morning discussion with Kevin of Ames. Ames to continue pushing ore material on to the <br /> lower bench; would continue maintaining a minimum thickness over the liner of 3.0 ft. <br />