Laserfiche WebLink
Daily Report <br /> VLF2 Crushed Ore Stockpile Removal <br /> 475.0106.030 ■ <br /> December 03,2018 <br /> Kevin notified CQA personnel that additional potholes would be excavated along the upper <br /> bench for a total of thirty-four (34) holes. The pothole locations would be staked out via <br /> survey and marked with corresponding ID number. <br /> 4.0 PHOTO <br /> t As <br /> I <br /> Figure 1. Ames removing ore down on to the lower bench, looking southwest. <br /> NewFields Mining Design &Technical Services <br /> Prepared by: <br /> Jose Armenta, CQA Monitor. <br /> jarmenta@ext.newfields.com Cell: 775-388-7756 <br />