My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-26_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2018-12-26_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:54 PM
Creation date
12/27/2018 4:02:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/26/2018
Doc Name Note
Part 2 of 2
Doc Name
Addendum To Application
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NewFields <br /> Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Crushed Ore Stockpile Removal <br /> NewFields Project Number: 475.0106.030 <br /> Date: December 03, 2018 <br /> S M T W T F S <br /> Temperature: Low: 2°F to High: 18°F <br /> Weather: Cloudy-Snow-Cold <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Jose Armenta 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> Ames continued removing ore material from area between benches at approximate elevation <br /> of 10020' and 9960'.The ore is being stockpiled at the lower bench using a CAT D6T LGP dozer <br /> equipped with GPS. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel monitored the ore being pushed down and stockpiled past the toe of <br /> the lower bench ensuring that proper procedures were used to prevent damage to the <br /> underlying synthetic liner. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> Attended the daily morning safety meeting conducted by Ames in the field at 0645 hrs. <br /> Morning discussion with Kevin of Ames. Ames to continue pushing ore material on to the <br /> lower bench; will continue maintaining a minimum thickness over the liner of 3.0 ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.