My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-26_REVISION - M2008078 (29)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2018-12-26_REVISION - M2008078 (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 2:08:25 AM
Creation date
12/26/2018 3:16:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
12/26/2018
Doc Name Note
Preliminary - Part 1 of 4
Doc Name
Adequacy Review Response
From
J&T Consulting
To
DRMS
Type & Sequence
AM1
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: Prowers Aggregate Operators, LLC. - West Farm Pit-Permit No. M-2008-078 <br /> 112c Permit Amendment Application (Revision No. AM-01) <br /> Preliminary Adequacy Review Response 12121118 <br /> -7- <br /> Phase/Location Phase/ Estimated Time Estimated Total <br /> Sequence Location Required to Reclamation <br /> Area Reclaim Phases Time <br /> acres ears ears <br /> Parking Area on the 6.25 Reclamation Complete 0 <br /> North Side of the Site/ <br /> Disturbed Areas <br /> Adjacent to the Pit <br /> Road in the North <br /> Mining Area/ <br /> Along the Ditch to the <br /> River North of the Pit <br /> 1-4 41.81 Reclamation Complete 0 <br /> 8,11 20.80 2 2 <br /> 7,10 21.02 2 4 <br /> 5,6 20.48 2 6 <br /> 9,12 23.16 2 8 <br /> 13-17/ 159.87 2 10 <br /> South Stockpile Area/ <br /> West Wash Plant and (Includes estimated <br /> Sediment Pond Area/ time required for seed <br /> Area West of Pit to germinate and <br /> Entrance Road/ become established) <br /> Parcel B Area <br /> 3h:1 v final reclaimed slopes will be established concurrently as mining <br /> progresses through the phases. At the completion of mining of the north mining <br /> area, topsoil, and seed will be placed above the reservoir water line on all <br /> disturbed areas, and topsoil and seed will be placed on the disturbed areas in the <br /> south mining and stockpile area, west wash plant and sediment pond area, and <br /> topsoil will be placed on the Parcel B area. See also the attached revised Exhibit E <br /> narrative. <br /> 21) Please specify the proposed post-mining land use for Parcel B. <br /> Response: The land in Parcel B will return to its historical agricultural use after <br /> mining is complete. <br /> 22) Please describe the reclamation to be achieved in Parcel B. Where will topsoil for this area <br /> be derived for reclamation? Is there an existing topsoil stockpile in this area, or will the <br /> topsoil be hauled in from Parcel A? <br /> Response: Parcel B will be reclaimed by being scarified and have topsoil placed <br /> on the surface. It will then be returned to its historical agricultural use. The topsoil <br /> for this parcel has been stockpiled in a berm along the east edge of the parcel as a <br /> screening berm and buffer from the adjacent property to the east. <br /> 23) Please describe the reclamation to be achieved for sediment ponds and any other water <br /> conveyance or storage structures to be reclaimed. <br /> Response: Any ponds or ditches that are outside the mining limits will be <br /> backfilled, topsoiled, and seeded or used as agricultural farm ground after mining <br /> V 1 305 Denver Avenue—Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222•Fax: 303-857-6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.