Laserfiche WebLink
Page 39 <br /> Construction Materials Rule 1 <br /> (6) there is only minimal or token excavation of construction material or <br /> other material; or <br /> (7) mine development has ceased and mining has not recommenced. <br /> 1.13.3 Indications Against Temporary Cessation <br /> 103(11) (1) Extraction of construction materials has been completed and only <br /> final reclamation and related activities occurring at the site are part <br /> of the 'life of the mine" (see Definition or see Section 34-32.5- <br /> 103(11), C.R.S.); or <br /> (2) a permit has been issued, but the mining operation has not <br /> commenced. <br /> 1.13.4 Temporary Cessation for a Portion of a Mining Operation <br /> There may be Temporary Cessation for part of the mining operation when <br /> one or more operations of several separable types within a permit has been <br /> discontinued. Movement of portable equipment between permitted sites <br /> shall not be construed to be Temporary Cessation. <br /> 1.13.5 Notice by Operator <br /> (1) If the Operator plans to, or does, temporarily cease production of <br /> the mining operation for one hundred eighty(180)days or more,the <br /> Operator must file a Notice of Temporary Cessation in writing,to the <br /> Office. <br /> (a) Initial period shall be the first five years of Temporary <br /> Cessation beginning with the 180 day period of production <br /> cessation. <br /> (b) The second five year period of Temporary Cessation shall <br /> begin at the end of the initial period of Temporary <br /> Cessation. <br />