Laserfiche WebLink
Page 40 <br /> Construction Materials Rule 1 <br /> (2) The Notice of Temporary Cessation for the initial period shall <br /> include the following: <br /> (a) the date of cessation; <br /> (b) the reasons for non-production or cessation of the mining <br /> operation; <br /> (c) a plan for resumption of mining; <br /> (d) the measures to be taken to comply with reclamation <br /> requirements and/or other activities related to the <br /> performance standards of Section 3.1 while the mine is in <br /> Temporary Cessation; and <br /> (e) demonstration that the existing Financial Warranty is <br /> adequate to cover the reclamation liability. <br /> (3) The Notice for the second period shall include the following: <br /> (a) demonstration that the existing Financial Warranty is <br /> adequate to cover the reclamation liability; <br /> (b) explanation as to why the Operator has not recommenced <br /> operations or begun reclamation; <br /> (c) demonstration of continued commitment to conduct mining <br /> operations at the site by the end of the second five year <br /> period. <br /> (4) Prior to the Board Hearing to consider the request for the second <br /> five year period of Temporary Cessation, the Office shall: <br /> (a) conduct an inspection of the site to verify compliance with <br /> the Act and Construction Material Rules and Regulations; <br /> (b) review the permit file for complaints against the operation <br /> and the status of resolution of those complaints; <br />