Page 38 <br /> Construction Materials Rule 1 <br /> 1.13.1 General Provisions <br /> (1) A permit granted pursuant to these Rules shall continue in effect as <br /> long as: <br /> (a) an Operator continues to engage in the extraction of <br /> construction material and/or the mining operation and <br /> complies with the provisions of the Act; and <br /> (b) construction material reserves are shown by the Operator <br /> to remain in the mining operation. <br /> (2) The Board will consider all relevant testimony and facts related to a <br /> mining operation in its determination as to whether or not <br /> temporary cessation has occurred. The Board recognizes that no <br /> one factor is necessarily determinative, but that each <br /> determination will be based on site-specific conditions. Factors to <br /> be included in the determination if a mine will be considered for <br /> temporary cessation, include, but are not limited to the following: <br /> 1.13.2 Indications of Temporary Cessation <br /> (1) there are no personnel working at the site for one hundred eighty <br /> (180)consecutive days; <br /> (2) there are only security personnel at the site; <br /> (3) there are personnel other than security people at the site, but they <br /> are engaged in activities which can be described as maintenance or <br /> housekeeping, or related activity; <br /> (4) there are personnel at the site, but they are engaged in activities <br /> which are not significantly moving the site towards completion of the <br /> mining operation. The Board will judge these activities in relation to <br /> the size of the operation, the nature of the deposit and other facts; <br /> (5) there is no sale or processing of material or movement of stockpiled <br /> material; <br />