Laserfiche WebLink
Page 1 of 2 <br /> QULLD©ZRR WORK <br /> Task description: Backlililog highwall <br /> Western Sugar Reclamation Permit Action: Financial Warranty <br /> Site: Land Development Pro ect Calculation _ Permit/loh#: M2010049 _ <br /> ENQJECT MENTINGATION <br /> Task N; 002 State: Colorado Abbreviation: None <br /> Date: 6/20/2011 County: Weld Filename: M049.002 <br /> User: MAC <br /> Agency or organization name. DRMS <br /> HOURLY EQUIPMENT COST <br /> Baste Machine: Cat D9R-9SU 200 <br /> t_.._5 <br /> 2_ <br /> Horsepower. 405 <br /> Blade Type: Sem.Universal <br /> Attachment: NA <br /> Shift Basis. IData Source: — <br /> _Cost Breakdown: <br /> Utilization <br /> Ownership CosUHour: 549.19 NA <br /> Operating Cost/Hour: Sl 17.89 100 <br /> Ripper op.Cost/Hour: -- $0.00 -- 0 -- <br /> Operator Cost/Hour: $38.49 -- NAV <br /> Total unit Cost/Hour: $205.56 <br /> Total Fleet Cost/Hour. $411.13 <br /> MATERIAL OUMIITIEB <br /> Initial Volume: 69,259 <br /> Swell factor: 1.000 <br /> Loose volume: 69,259 LCY <br /> Source of estimated volume: Division of Rectamation,-Minintt&Safety___ <br /> Source of estimated swell factor; Cat Handbook <br /> HOUP."PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 2,110.3 LCY/hr} - <br /> Materiais oonslatency description: _Loose stockpile 1.2 <br /> Average push gradient: 30% <br /> Average site altitude: 4z600 feet <br /> Material weight: 2 6501bs/LCY <br /> Weight description: wed roek�25°/a Rock 75!/o Earth <br /> lob Condition Coacclion Factor source <br /> Operator Skill: _ 0.750 (AVG.) <br /> Material consistency: _ 1.200 ____.(CATHB) <br /> cateRS Cost Foinutinn soomare <br />