Laserfiche WebLink
Bulldozer Worksheet Cont'd Task N 002 Page 2 of 2 <br /> Dozing method: '--�-y 1.000 (OEN.) <br /> Visibility: 1.000 (AVO_) �___ <br /> Job efficiency: 0.830 (1 SH1FTMAY) <br /> Spoil pile: 0.900 (SSD•FC) <br /> Push gradient: 0.298 (CAT 118 <br /> Altitude: 1.000 (CAT 118) <br /> Material Weight: 0.868 (CATHB)_ <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.1739 <br /> Adjusted unit production: 367.02 LCY/hr _ <br /> Adjusted Beet production: 734.04 LCYRtr <br /> M TIME AND COST <br /> Fleet sl7.e: 2 Dozer(s) <br /> Unit cost: S0•560/LCY <br /> Total job time: 94.35 Haws <br /> Total job cost: _$38�791.28 <br /> CIRCES Cost EMI Mins SONAM <br />