Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Western Sugar Reclamation Permit Actlow Financial Warranty <br /> Site: Land Development Project _ Calculation PermitOoK M2010049 <br /> I'jiiiO,i!0=N=CATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> : <br /> Date: 6/21/2011 Count Weld ____. <br /> User: MAC _ y ---�`� -_�_�---- ------ Filename: M049-006 <br /> Agency or organization name: DBMS <br /> TASK LIM WJR)ECT C05TSl <br /> Task Form Fleet Task <br /> Description Used Size Hours i Cost <br /> 001 Dewaterin Tract PUMPING 1 _ 2495.69 517,515.00 <br /> 002 Backfilling hi wall DOZER 2 94.35 $38,791.28 <br /> 003 Rglacing Topsoil SCRAPER] 1 21.19 $4,821.10 <br /> 004 Reve station of Disturbed Areas - REVEGE 1 0.00 $13,977.39 <br /> 005 E ui entMobilizationlDemobilization MOBILIZE 1 1 3.57 $5,230A6 <br /> 006 Replacement Em INA 1 0.00 $20,528.22 <br /> 007 Road Maintenance MISCTRUK 1 29.00 $1,883.00 <br /> 003 Road Grading GRADER 1 2.67 5232.00 <br /> 3Ug�OTAI,S; 2646.47 S$102,978.45 <br /> MUM" <br /> pVERUAD AND PROFIT• <br /> Liability insurance: 2.02 Total Q $2,080.16 <br /> Performance bond: 1.05 Total- S1,081.27 <br /> Job superintendent: 0.00 Total= SO.00 <br /> Profit: 10.00 Total= S10z297.85, <br /> TOTAL O&P- S 13,459.28 <br /> CONTRACT AMOUNT(direct+0&P) _S 116,437.73 _ <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): _.0.00_ __ _ Total- 0.00 <br /> Engineering work and/or contract/bid preparation: 4.25 Total•_ $4 9413.60 _ <br /> Reclamation management wWoradministration: 5.00___ $5,821.89 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST a 524,229.77 <br /> TOTAL BOND AMOUNT(direct+indirect)= S12UO&22 <br />