Laserfiche WebLink
• All haul roads interior to the borrow site will be maintained during mining <br />operations to be safe and to function properly. <br />• Road maintenance will include maintaining proper drainage, runoff controls, and <br />dust control, as needed. <br />• No on-site scale, processing facility, office, shop.'maintenance facility, plant, or any <br />underground openings will be needed. <br />(f) Specify the dimensions of any significant disturbance to the land surface such as <br />pit excavations, mine benches, impoundments, stockpiles, waste rock disposal areas, <br />etc: <br />• Please see Exhibit E - Pre -Mine: Mine Plan Map for pit dimensions and estimated <br />excavation limits. No mine benches, impoundments or waste rock disposal areas <br />are anticipated. <br />• Since the mining operations will generally be a truck and shovel operation, the <br />slopes during mining will be .5H: I V As we approach the perimeter of the <br />borrow pit, we will mine at a 3H.• 1 V slope to eliminate the need to backfill the <br />highwalls. <br />(g) Specify the dimensions of any existing or proposed roads that will be used for <br />the mining operation. Describe any improvements necessary on existing roads and <br />the specifications to be used in the construction of new roads. Describe any <br />associated drainage and runoff conveyance structures to include sufficient <br />information to evaluate structure sizing: <br />As to pit access, please see Section 6.3.3(1)(e) above. <br />No runoff or conveyance structures are planned. <br />A short driveway will be constructed for site access. It will conform to CDOT <br />standards. <br />(h) Specify the amount of water will be used in conjunction with the operation, and <br />the source of the water: <br />• The only water needed for the borrow pit operation is what will be needed for <br />road watering for fugitive dust control. A typical gravel mining operation may be <br />expected to use about 1.3 acre-feet of water per year for dust control. The borrow <br />operation should not exceed 12 months of actual excavation. Therefore 1.3 acre- <br />feet of water should be sufficient for dust control. There will be no other uses of <br />water at the borrow site. <br />• Water for the project will be purchased locally. <br />(i) If Ground water will be encountered and/or surface water intercepted or disturbed, <br />describe how mining will affect the quantity and quality of the surface or ground water and <br />the methods to be used to minimize disturbance to the surface and ground water systems <br />including proposed dewatering, sediment -containment or chemical treatment systems, storm <br />water run-off controls, and ground water points of compliance: <br />Neither ground nor surface water will be intercepted or disturbed by the proposed borrow pit <br />mining and reclamation activities. if necessary, a Stonnwater Management Permit will be secured <br />from the Colorado Department of Public Health and Environment, Water Quality Control Division <br />(WQCD). In any event, SEMA will implement its Corporate Stonnwater <br />Revised Page 32 <br />