My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-30_PERMIT FILE - C1981038 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2018-03-30_PERMIT FILE - C1981038 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2018 8:00:18 AM
Creation date
10/29/2018 7:57:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
3/30/2018
Section_Exhibit Name
Volume 7 3.05 Bond Requirements Paonia Loadout
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 3 of3 <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 175.00 (unadjusted): $363,864.05 location): $357,314.50 <br />CIRCES Cost Estimating Solware <br />excavated pit - Max <br />200 ft. push <br />Pump House at <br />813sgft <br />Demo. and on-site <br />813.00 <br />SF <br />$1.09 <br />$882.92 <br />Loadout Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />Pump House at <br />1944 sgft <br />Demo. and on-site <br />1,944.00 <br />SF <br />$1.41 <br />$2,741.04 <br />Loadout Walls <br />disposal in excavated <br />pit, 12 in. thick- Max <br />200 ft. push <br />Railroad Track <br />7088 If <br />Railroad track- Ties <br />7,088.00 <br />IF <br />$9.32 <br />$66,060.16 <br />and track <br />Railroad Track <br />1590 cy <br />Railroad track- Ballast <br />1,590.00 <br />CY <br />$4.58 <br />$7,282.20 <br />Ballast <br />Bridge Reclamation <br />1 bridge <br />USER PROVIDED <br />1.00 <br />ea <br />$156,669.00 <br />$156,669.00 <br />(Adjus ted Cyprus <br />ITEM <br />Estimate) <br />500 Callon Fuel <br />500 gal <br />Hazardous waste <br />2.00 <br />DRUM <br />$490.98 <br />$981.96 <br />Tank(2) <br />removal- Drum <br />solids/liquids, per <br />drum, (7+ drum job) <br />500 Callon Fuel <br />500 gal <br />Remove sludge, water, <br />2.00 <br />EA <br />$288.50 <br />$577.00 <br />Tank(2) Remove <br />and rem. product from <br />Sludge <br />tank- 3,000 to 5,000 <br />al. <br />500 Callon Fuel <br />100 gal <br />Disposeoftanksludge <br />100.00 <br />GAL <br />$5.44 <br />$544.00 <br />Tank(2) Disposal <br />off-site - Average <br />of Sludge <br />500 Gallon Fuel <br />15 lbs <br />Insert dry ice (CO2) <br />15.00 <br />LB <br />$1.78 <br />$26.70 <br />Tank(2) Add CO2 <br />into tank to produce <br />for Tank Cleaning <br />inert gas -1.5 lbs./100 <br />gal. <br />500 Gallon Fuel <br />2 tanks <br />Haul tank to certified <br />2.00 <br />EA <br />$760.00 <br />$1,520.00 <br />Tank(2) Haul <br />salvage dump -3,000 <br />Tanks to Certified <br />to 5,000 gal. tank <br />Dump <br />Concrete Disposal <br />1911 CY <br />Loading and 5 mile <br />1,911.00 <br />CY <br />$12.60 <br />$24,078.60 <br />Charges <br />haul, salvage allowed - <br />Concrete frame <br />structures <br />CulvertRemoval- <br />24 inches <br />Pipe, corrugatedmetal <br />934.00 <br />LF <br />$6.47 <br />$6,044.85 <br />24" Culvert <br />(CMP) - 24 in. <br />diameterpipe <br />Culvert Removal- <br />36 inches <br />Pipe, corrugatedmetal <br />36.00 <br />LF <br />$10.09 <br />$363.28 <br />36" Culvert <br />(CMP) - 36 in. <br />diameter i e <br />CulvertRemoval- <br />60 inches <br />Pipe, corrugated metal <br />465.00 <br />LF <br />$19.65 <br />$9,135.39 <br />60" Culvert <br />(CMP) - 60 in. <br />diameter i e <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 175.00 (unadjusted): $363,864.05 location): $357,314.50 <br />CIRCES Cost Estimating Solware <br />
The URL can be used to link to this page
Your browser does not support the video tag.