Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 2 of <br />Coal Storage Silos <br />11545 sqft <br />Floor, concrete, <br />11,545.00 <br />SF <br />$1.18 <br />$13,623.10 <br />Superstructure Slab <br />demolition only, <br />average reinforcing - <br />12 in. thick <br />Coal Storage Silos <br />89 cy <br />Demo. and on-site <br />89.00 <br />LF <br />$2.82 <br />$250.98 <br />Superstructure <br />disposal in excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />MCC at Silo <br />504 sqft <br />Demo. and on-site <br />504.00 <br />SF <br />$1.09 <br />$547.34 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />Substation <br />291 sqft <br />Demo. and on-site <br />291.00 <br />SF <br />$1.09 <br />$316.03 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />Substation <br />168 If <br />Demo. and on-site <br />168.00 <br />LF <br />$2.82 <br />$473.76 <br />Superstructure <br />disposal in excavated <br />Footing <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />Shop Building <br />150000 cf <br />Bldg. (SN) demo./on- <br />150,000.00 <br />CF <br />$0.19 <br />$29,100.00 <br />Superstructure <br />site disposal in <br />excavated pit -Max <br />200 ft. push <br />Shop Building <br />5420 sqft <br />Demo. and on-site <br />5,420.00 <br />SF <br />$1.02 <br />$5,517.56 <br />Superstructure Slab <br />disposal in existing pit, <br />10 in. thick- Max 200 <br />ft. push <br />Shop Building <br />3001f <br />Demo. and on-site <br />300.00 <br />LF <br />$2.82 <br />$846.00 <br />Superstructure <br />disposal in excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />Pump House at Silo <br />1164 sqft <br />Demo. and on-site <br />1,164.00 <br />SF <br />$1.09 <br />$1,264.10 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />MCC at Loadout <br />672 sqft <br />Demo. and on-site <br />672.00 <br />SF <br />$1.09 <br />$729.79 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />Misc Fencing <br />28001f <br />Fencing, chain link, <br />2,800.00 <br />LF <br />$3.07 <br />$8,596.00 <br />including posts and <br />fabric - 8 ft. to 10 ft. <br />high <br />Train Loadout <br />900 sqft <br />Demo. and on-site <br />900.00 <br />SF <br />$1.09 <br />$977.40 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />Train Loadout <br />120 if <br />Demo. and on-site <br />120.00 <br />LF <br />$2.82 <br />$338.40 <br />Superstructure <br />disposal in excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />Train Loadout <br />120 If <br />Fencing, chain link, <br />120.00 <br />LF <br />$3.07 <br />$368.40 <br />Superstructure <br />including posts and <br />Fence <br />fabric - 8 ft. to 10 ft. <br />high <br />Pump House at <br />16280 cf <br />Bldg. (MN) demo./on- <br />16,280.00 <br />CF <br />$0.22 <br />$3,581.60 <br />Loadout <br />site disposal in <br />Superstructure <br />CIRCES Cost Estimating Sofware <br />