Laserfiche WebLink
DEMOLITION WORK <br />Task description: Demolish and Remove all Structures at Train Loadout <br />Site: Bowie No. 1 Mine <br />PROJECT IDENTIFICATION <br />Penn it Action: Bond Release 6(SL-6) Permit/Job#: C1981038 <br />Task#: 202 State: Colorado Abbreviation: None <br />Date: 1/18/2018 County: Delta Filename: C038-202 <br />User: CCW <br />Agency or organization name <br />UNIT COSTS <br />DRMS <br />Location adjustment: 98.20 % <br />Structure or Item <br />Demolition Menu <br />Description <br />Dimensions <br />Selection <br />Quantity <br />Unit <br />Unit Cost <br />Total Cost <br />TruckDump <br />1200 sqft <br />Demo. and on-site <br />1,200.00 <br />SF <br />$1.09 <br />$1,303.20 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />TruckDump <br />48001f <br />Demo. and on-site <br />4,800.00 <br />LF <br />$2.82 <br />$13,536.00 <br />Superstructure <br />disposal in excavated <br />Footing <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />MCC at Truck <br />364 sqft <br />Demo. and on-site <br />364.00 <br />SF <br />$1.09 <br />$395.30 <br />Dump <br />disposal in excavated <br />Superstructure Slab <br />pit, 10 in. thick- Max <br />200 ft. push <br />Scrubber <br />10 if <br />Demo. and on-site <br />10.00 <br />LF <br />$2.82 <br />$28.20 <br />Superstructure <br />disposal in excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />TunnelBuilding <br />1152 sqft <br />Demo. and on-site <br />1,152.00 <br />SF <br />$1.09 <br />$1,251.07 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />TunnelBuilding <br />128 If <br />Demo. and on-site <br />128.00 <br />LF <br />$2.82 <br />$360.96 <br />Superstructure <br />disposalin excavated <br />Footings <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />TunnelBuilding <br />1440 sqft <br />Demoand on-site <br />1,440.00 <br />SF <br />$1.41 <br />$2,030.40 <br />Superstructure <br />disposal in excavated <br />Concrete Tunnel <br />pit, 12 in. thick- Max <br />200 ft. push <br />Truck Scale <br />768 cf <br />Bldg. (SN) demo./on- <br />768.00 <br />CF <br />$0.19 <br />$148.99 <br />Superstructure <br />s ite d is posal in <br />excavated pit -Max <br />200 ft. push <br />Truck Scale <br />996 sqft <br />Demo. and on-site <br />996.00 <br />SF <br />$1.09 <br />$1,081.66 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />Silo Fan Footing <br />4.5 if <br />Demo. and on-site <br />4.50 <br />LF <br />$2.82 <br />$12.69 <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - <br />Max 200 ft. push <br />Silo Buildings <br />256 sqft <br />Demo. and on-site <br />256.00 <br />SF <br />$1.09 <br />$278.02 <br />Superstructure Slab <br />disposal in excavated <br />pit, 10 in. thick- Max <br />200 ft. push <br />