Laserfiche WebLink
Prowers Aggregate Operators LLC <br /> J&T Consulting, Inc. <br /> West Farm Pit <br /> 8/21/2018 <br /> FReclamation Bond Quantities and Costs <br /> Censu t bm Inc. <br /> Phase 1$(11 56 acres) <br /> Reclamation Operation Quantity Unit Unit Cost ost <br /> Active Mining Area <br /> Slurry Wall Required to Close Phases 13-17(45'avg Depth) 5,407 If $135 $729,945 <br /> Credit for Scarifying Ground in Temporary Stockpile Disturbed Area (11 56) ac $322 -$3,717 <br /> Credit for Topsoil Placement in Temporary Stockpile Disturbed Area (11 56) ac $2,541 -$29,374 <br /> Credit for Revegetate Disturbed Area in Temporary Stockpile Disturbed Area (11.56) ac $1,100 -$12,720 <br /> Topsoil Area Above Water Required for Phase 13 266 ac $2,541 $6,755 <br /> Revegetate Area Above Water Required for Phase 13 266 ac $1,100 $2,925 <br /> Total Direct Cost $693,814 <br /> Overhead and Profit Cost(13 07%) $90,681 <br /> Contract Cost $784,496 <br /> Project Management(7 00%) $48,567 <br /> Additional Financial Warranty Required For Phase 13 $833,063 <br /> Phase 14(11 51 acres) <br /> Reclamation Operation Quantity Unit Unit Cost ost <br /> Active Mining Area <br /> Credit for Scarifying Ground in Temporary Stockpile Disturbed Area (11 51) ac $322 -$3,701 <br /> Credit for Topsoil Placement in Temporary Stockpile Disturbed Area (11 51) ac $2,541 -$29,247 <br /> Credit for Revegetate Disturbed Area in Temporary Stockpile Disturbed Area (11 51) ac $1,100 -$12,665 <br /> Credit for Topsoil Area Above Water Required for Phase 13 (2 66) ac $2,541 -$6,755 <br /> Credit for Revegetated Area Above Water Required for Phase 13 (2 66) ac $1,100 -$2,925 <br /> Topsoil Area Above Water Required for Phases 13-14 424 ac $2,541 $10,775 <br /> Revegetate Area Above Water Required for Phases 13-14 424 ac $1,100 $4,666 <br /> Total Direct Cost -$39,852 <br /> Overhead and Profit Cost(13 07%) -$5,209 <br /> Contract Cost -$45,060 <br /> Project Management(7 00%) -$2,790 <br /> Additional Financial Warranty Required For Phase 14 -$47,850 <br /> Phase IS(11.43 acres) <br /> ec amation Operation Quantity Unit Unit Cost Cost <br /> Active Mining Area <br /> Credit for Scarifying Ground in Temporary Stockpile Disturbed Area (11.43) ac $322 -$3,675 <br /> Credit for Topsoil Placement in Temporary Stockpile Disturbed Area (11 43) ac $2,541 -$29,044 <br /> Credit for Revegetate Disturbed Area in Temporary Stockpile Disturbed Area (11.43) ac $1,100 -$12,577 <br /> Credit for Topsoil Area Above Water Required for Phases 13-14 (4.24) ac $2,541 -$10,775 <br /> Credit for Revegetated Area Above Water Required for Phases 13-14 (4 24) ac $1,100 -$4,666 <br /> Topsoil Area Above Water Required for Phases 13-15 530 ac $2,541 $13,463 <br /> Revegetate Area Above Water Required for Phases 13-15 530 ac $1,100 $5,830 <br /> Total Direct Cost -$41,444 <br /> Overhead and Profit Cost(13 07%) -$5,417 <br /> Contract Cost -$46,861 <br /> Project Management(7.00%) -$2,901 <br /> Additional Financial Warranty Required For Phase 15 -$49,762 <br /> 4 of 5 <br />